This is where we were with the second building. If it weren't for our little delay we'd have the walls up on the second building, but oh well.
Katie also proved to be a big help on the construction crew as well. She was showing up a lot of the workers and it really lit a fire under their feet because they didn't want to be outdone by the white girl.
Two courses of barbed wire are placed between each layer of bags. A line is run about six inches above each row of bags for a guide to tamp the bags level and to the appropriate height.
It's nice to see our facilities being used by the local community for meetings and we're happy to cooperate and help in any way that we can.
1 comment:
glad to see your progress with the bags
God is good
jpu
Post a Comment